Undertake a site visit and prepare a phase 1 environmental report.

Image
Newpark International UK Ltd & Newpark Resources Inc

Harding Cargo Handling Ltd

Brief:

Prepare a site condition report for the areas around the docks that were to be used for storage and handing of waste.

Image
Docks
Image
Docks

Local Authorities

Royal Borough of Greenwich

Instructed by: Russell + May Associates

Brief:

GO Contaminated Land Solutions were asked to complete a ground and hydrological condition report to assess the potential impact of the proposed basement development.

Housing Associations

East End Homes

Brief:

Provide advice on an area within a residential estate that was proposed for use as a community allotment.

Wandle Housing Association

Brief:

To investigate the soil in the gardens on an estate following complaints from residents of poor plant growth and adverse impacts on the health of pets.

Image
A typical rear garden
A typical rear garden
Image
Rubble
Items we found in just one trial pit included a scaffold clip, builders’ rubble and car parts.

Sanctuary Group (London & SE)

Brief:

We were tasked with completing phase 1 desktop studies for 19 sites throughout Haringey.

Developer

Lexadon

Instructed by: db Architects

Image
Lexadon
Image
Lexadon
Image
Lexadon

Contractors

R Durtnell & Sons Ltd

Brief:

Our commitment was to provide Phase 1 Environmental Report and Phase 2 Geo-Environmental investigation.

Image
R Durtnell & Sons Ltd
Image
R Durtnell & Sons Ltd
Image
R Durtnell & Sons Ltd

Allenbuild Ltd

Brief:

Complete a Phase 2: Geo-Environmental Investigation, Phase 3: Remediation Strategy and Phase 4: Verification Report

Image
Allenbuild Ltd
Image
Allenbuild Ltd

Allenbuild Ltd

The Brief:

Provide our client with a Phase 4: Verification Report in order to demonstrate that remediation measures have been completed.

Image
Wheel barrow and spades
Image
Allenbuild Ltd

Allenbuild Ltd

Brief:

We were instructed to complete a phase 2 intrusive investigation and develop a sampling strategy and in due course undertake verification.

Image
Allenbuild Ltd
Image
Allenbuild Ltd

Beamridge Ltd

Instructed by: Calford Seaden

Brief:

A phase 1 environmental report and a phase 2 geo-environmental investigation was undertaken.

Image
Beamridge Ltd

Osborne Ltd

Brief:

Osborne Ltd won the Westminster City Council tender for this project and employed GO Contaminated Land Solutions to conduct additional testing and investigate some unexpected contamination identified on site.

Image
Osborne Ltd

Kingston Landscape Group

Brief:

We were contacted to give consultancy advice on the suitability of topsoil for proposed Addlestone Town Centre Development after concerns were expressed by a stakeholder.

Image
Kingston Landscape Group

Charities

Blind Veterans UK

Brief:

We were instructed to design a suitable investigation strategy, visit site and take soil samples and complete a report on the suitability of the site for its proposed use.