Bangrave Road, Corby

Bangrave Road, Corby

Brief:

Produce a phase 1 environmental desk top study for a site at Corby to assess the risks to sensitive receptors both on and off-site due to soil and groundwater contamination as a result of the proposed development.

Project:

The client requested that in addition trial pits be excavated throughout the site to allow a visual inspection to determine the depth and nature of made ground as much of the site had been filled.

Portlethen, Aberdeen

Portlethen, Aberdeen

Brief:

Undertake a site visit and prepare a phase 1 environmental report.

Project:

The report was required as part of the pre-purchase due diligence for a chemical storage and distribution site in Aberdeen. On site were offices and chemical storage facilities with a number of external above ground storage tanks. A drainage ditch ran along the rear boundary.